Quick Stats
Filtering: In Progress
Value Sent
£0
Customers Quoted
1
Opportunities List
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Holloway Controls Systems Ltd
Marelli Interiors United Kingdom
Marelli Interiors United Kingdom
Marelli Interiors United Kingdom
Marelli Interiors United Kingdom
Motion Tech
AESC UK Plant 2 Limited
Software Engineer for 37.5Hours - Day Shift Only - Monday - Thursday (8:00am - 4:30pm) - Friday (8:00am - 1:30pm)
AESC UK Plant 2 Limited
NMUK
NMUK
NMUK
Replace lifter idle rollers with itoh denki motorised 24vdc system, replacing the whole frame may be the best option. Idle rollers at transfer point to be motorised, needs to be able to be lifted to allow passage from one side to the other as it does now. Remove pneumatic pusher. Either ihoh denki motors or replace pusher with electrical cylinder/drive to allow forward and reverse functionality. Additional RFID head/controller on lift. Software mods to allow empty pallet to be loaded at ground level RFID mods for empty pallet, will travel to line side RFID read then return to empty conveyor. Matty is going to measure up for the roller length. Need to check if HMI downstairs can talk to Set aside system, Safety on lifter needs to be interlocked with set aside. Summer shutdown job.
Expert Aviation Technologies Ltd
NKC Conveyors ( UK) Ltd
AESC UK Plant 2 Limited
NKC Conveyors ( UK) Ltd
LPC Switchgear Ltd
PD Ports
NKC Conveyors ( UK) Ltd
Site supervisor for Toyota France, 8 weeks July & August 2027. Quote from NKC was "needs to be Jonny or someone like Jonny" Hotel and Travel in France covered by NKC. AR to include flights to Brussels , cost of living, 6x10 hour shifts per day. Sunday off due to French working time laws.
NMUK
BAE Systems Land (UK)
Amazon NCL2
Spartan UK Ltd
Pipeflex Systems Ltd
Quote ID | Sub-Status | Stage | Description | Customer | Value | Salesperson | Actions |
|---|---|---|---|---|---|---|---|
Q26-10425 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) (Copy) (Copy) (Copy) (Copy) (Copy) | Holloway Controls Systems Ltd No Contact | £0 50% prob. | Adam Wright | |
Q26-10424 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) (Copy) (Copy) (Copy) (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10423 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) (Copy) (Copy) (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10422 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) (Copy) (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10421 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10420 Created: 13/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10419 Created: 04/06/2026 | None | In Progress | Sysco Brakes Standby Support (Copy) | Holloway Controls Systems Ltd Ian Crabtree | £0 50% prob. | Adam Wright | |
Q26-10418 Created: 04/06/2026 | None | In Progress | P33B MC2 – Lid Cluster C (LHD / RHD) (Copy) (Copy) (Copy) (Copy) | Marelli Interiors United Kingdom Callum Tufton | £0 50% prob. | Adam Wright | |
Q26-10417 Created: 04/06/2026 | None | In Progress | P33B MC2 – Lid Cluster C (LHD / RHD) (Copy) (Copy) (Copy) | Marelli Interiors United Kingdom Callum Tufton | £0 50% prob. | Adam Wright | |
Q26-10416 Created: 04/06/2026 | None | In Progress | P33B MC2 – Lid Cluster C (LHD / RHD) (Copy) (Copy) | Marelli Interiors United Kingdom Callum Tufton | £0 50% prob. | Adam Wright | |
Q26-10415 Created: 04/06/2026 | None | In Progress | P33B MC2 – Lid Cluster C (LHD / RHD) (Copy) | Marelli Interiors United Kingdom Callum Tufton | £0 50% prob. | Adam Wright | |
Q26-10411 Created: 27/05/2026 | None | In Progress | Electrical Installation support - 5862 IMS Euro | Motion Tech Charles Marine | £0 50% prob. | Adam Wright | |
Q26-10407 Created: 20/05/2026 | None | In Progress | Area E - Software Engineer 37.5Hours Rolling Weekly Software Engineer for 37.5Hours
- Day Shift Only
- Monday - Thursday (8:00am - 4:30pm)
- Friday (8:00am - 1:30pm) | AESC UK Plant 2 Limited James Wilson | £2,625 50% prob. | Adam Wright | |
Q26-10406 Created: 20/05/2026 | None | In Progress | Pack Line PZ1D OCV Test Equipment Station | AESC UK Plant 2 Limited Phoebe Lin Xiaoting | £0 50% prob. | Adam Wright | |
Q26-10402 Created: 19/05/2026 | None | In Progress | Trim Line Safety Upgrade | NMUK Graeme Green | £100,899.9 50% prob. | Adam Wright | |
Q26-10398 Created: 15/05/2026 | None | In Progress | L2 Rear Axles AGV - Facility concerns (Copy) | NMUK Michael Armstrong | £49,288 50% prob. | Andy Ramsey | |
Q26-10397 Created: 14/05/2026 | None | In Progress | Seats Set-Aside Pallet Insertion Replace lifter idle rollers with itoh denki motorised 24vdc system, replacing the whole frame may be the best option. Idle rollers at transfer point to be motorised, needs to be able to be lifted to allow passage from one side to the other as it does now. Remove pneumatic pusher. Either ihoh denki motors or replace pusher with electrical cylinder/drive to allow forward and reverse functionality. Additional RFID head/controller on lift. Software mods to allow empty pallet to be loaded at ground level RFID mods for empty pallet, will travel to line side RFID read then return to empty conveyor.
Matty is going to measure up for the roller length. Need to check if HMI downstairs can talk to Set aside system, Safety on lifter needs to be interlocked with set aside. Summer shutdown job. | NMUK Amar Singh Chana | £0 50% prob. | Adam Wright | |
Q26-10396 Created: 13/05/2026 | None | In Progress | N15 & N16 Extension | Expert Aviation Technologies Ltd James Baker | £105,023.1 50% prob. | Jonathan Bell | |
Q26-10395 Created: 13/05/2026 | None | In Progress | N15 & N16 Extension (Copy) | NKC Conveyors ( UK) Ltd Murotani Hiroki | £24,774.4 50% prob. | Jonathan Bell | |
Q26-10393 Created: 11/05/2026 | None | In Progress | Electrolyte Injection Machine Outfeed Inspection Station Modification Line 1 | AESC UK Plant 2 Limited Jordan Chambers | £0 50% prob. | Adam Wright | |
Q26-10384 Created: 01/05/2026 | None | In Progress | N15 & N16 Extension | NKC Conveyors ( UK) Ltd Murotani Hiroki | £24,774.4 50% prob. | Jonathan Bell | |
Q26-10373 Created: 23/04/2026 | None | In Progress | Power Management System | LPC Switchgear Ltd Sam Crossley | £53,097 50% prob. | Adam Wright | |
Q26-10366 Created: 15/04/2026 | None | In Progress | Buttimer Hoppers 3 & 4 | PD Ports Gavin Waugh | £67,598.524 50% prob. | Andy Ramsey | |
Q26-10364 Created: 14/04/2026 | None | In Progress | Site Supervisor Site supervisor for Toyota France, 8 weeks July & August 2027. Quote from NKC was "needs to be Jonny or someone like Jonny" Hotel and Travel in France covered by NKC. AR to include flights to Brussels , cost of living, 6x10 hour shifts per day. Sunday off due to French working time laws. | NKC Conveyors ( UK) Ltd Murotani Hiroki | £44,800 50% prob. | Jonathan Bell | |
Q26-10360 Created: 07/04/2026 | None | In Progress | Final Parts Inspection Station Axle & Suspension shop | NMUK Garry Stokell | £159,850 50% prob. | Adam Wright |