95 Dashboard SALES & PROJECTS Opportunities Projects Cost Analysis OPERATIONS Purchase Orders Task Monitor QA Centre Voice Dictation FINANCE ADMINISTRATION Customers Suppliers Inventory Employees My File Deployed: 16/06/26 10:10|v5.1.5 Database: ops_ar_erp_dev Projects Manage your project portfolio Failsafe Cowork On Bug Fix Claude Dev 24 Active Projects £893,257.01 Active Project Value £343,734.348 Active Invoiced £58,385.556 Outstanding Balance My Projects Only All Statuses Active Planning On Hold Completed Cancelled Default Filters Refresh Clear Filters New Project Active filters: Sorted by: transaction_no (Z-A) 150 Projects ID Status Customer Description Value BUDGET Progress Due Date ACTIONS Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade (NMUK) £320.00 On Track 100% - Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade (NMUK) £320.00 On Track 100% - Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade (NMUK) £320.00 On Track 100% - Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade (NMUK) £320.00 On Track 100% - Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade — DEDUP COPY (review) £320.00 On Track 100% - Q25-10194 Completed NMUK RTO 1,2,3 Control Upgrade (NMUK) £320.00 On Track 100% - J3193 Active Holloway Controls Systems Ltd Onsite Software Support Including travel and accommodation: • Saturday 30th May: Evening shift 16:30–00:00 (7.5 hours) — Controls Engineer • Friday 5th June: Dual shift coverage 14:00–18:30 and 18:30–23:00 (9 hours) — Controls Engineer This is for software support only using TIA V19/V20. £1,389.50 On Track 0% - J3192 Active NMUK RTO 1,2 & 3 Control Upgrade £551,435.00 On Track 0% 31/05/2027 J3191 Active LAC Conveyor Systems Ltd Supply Only - Balluff I/O Block £588.26 On Track 0% 22/05/2026 J3190 Active NMUK Remove brake gun hardware, software and HMI screens. Modify drawings. Shutdown job. £8,017.60 On Track 0% 09/08/2026 J3189 Active NMUK Battery Marriage Software support £5,174.40 On Track 0% 29/05/2026 J3188 Completed NMUK Production stop/start pushbutton station, wiring, drawings, software £1,075.74 On Track 100% 22/05/2026 J3187 Active NMUK Camera station software £1,386.00 On Track 0% 24/07/2026 J3186 Active NKC Conveyors ( UK) Ltd FL32 Additional Switch £2,987.20 On Track 0% 30/05/2026 J3185 Completed NMUK Relocate PLC HMI, make profinet connection/ring good. £2,044.50 On Track 100% 22/05/2026 J3184 Completed Holloway Controls Systems Ltd Electrical installation support clean room £1,276.00 On Track 100% - J3183 Active Salamander Pumps New seal press system for motor seal press. £41,760.18 On Track 0% 30/09/2026 J3182 Active NMUK Paint Shop Overhead 4 Drives £4,933.40 On Track 0% 30/06/2026 J3181 Active Holloway Controls Systems Ltd Powder Storage Commissioning Support £31,392.00 On Track 90% - J3180 Active NMUK Scrap and Build Net 10 Decommission £39,343.75 On Track 0% 31/12/2026 J3179 Completed ADS Ltd Brighton Hove Gardens Call Out Including Hotel, Travel, Work Hours. £1,107.50 On Track 100% - J3178 Completed Holloway Controls Systems Ltd Powder Stores Commissioning £2,572.50 On Track 100% - J3177 Active NMUK L2 Rear Axles AGV - HMI and Alarm improvements £6,667.00 On Track 0% - J3176 Completed Marelli Interiors United Kingdom Cooling Fixture Jig £6,000.00 On Track 100% - J3175 Active NMUK Solvent Auto top up valve controls £5,673.00 On Track 0% - J3174 Completed NMUK Battery Marriage Additional cover £19,206.00 On Track 100% - J3173 Completed NKC Conveyors ( UK) Ltd Additional hardware and labour £2,084.23 On Track 100% - J3172 Completed NMUK Chris Brookes call out 22 of March 2026 £320.00 On Track 100% - J3171 Completed GB Lubricants Intergrate 2 x mixers into new control system £1,377.60 On Track 100% - J3170 Completed NKC Conveyors ( UK) Ltd Quotation required to allow the count to be reduced on FL51. This is to allow continued dolly build between shifts. Considerations below. Dolly count is linked into the ED Tank if no dollies are sitting in FL51 then TPQC cannot pull bodies into the ED process. If not enough dollies are there then bodies may get stuck in the ED tank.. 2ND Part of quote is an auto throw out call button on dolly jetter HMI. Op can set dolly number on HMI, RFID will auto throw out dolly and alert TPQC/PCR on iconics. £3,668.50 On Track 100% - J3169 Active Haskel Europe Ltd Supply & Drill Enclosure - EN-A017-Q028 £278.32 On Track 100% - J3168 Active NMUK Data collection similar to TC Control. Need to develop a function block suitable. £9,075.00 On Track 5% - J3167 Completed Yaskawa UK Ltd Machining to Rittal Panel Door £160.00 On Track 100% - J3166 Active Marelli Interiors United Kingdom 6x Harnesses £1,378.00 On Track 94% - J3165 Completed NMUK Mitsubishi Inverter for Service Parts Duel Conveyor Drive £2,114.00 On Track 100% - J3164 Completed ADS Ltd Investigate Non-Functioning Mimic Panel £1,325.00 On Track 100% - J3163 Completed Gates Engineering & Services UK Ltd Call Out Gates - Spiral machine front £320.00 On Track 100% - J3162 Completed Holloway Controls Systems Ltd Powder Storage Software Support Extension £18,971.00 On Track 90% - J3161 Completed NMUK Leave LG in place, change drawings, renumber, additional switches for mode select, change software, update HMI screens. £600.20 On Track 100% - J3160 Active NMUK Solvent Farm Top Up Procurement £3,000.00 On Track 0% - J3159 Active NMUK HCT PTC Bolting tracking Installation and drawings completed £6,098.40 On Track 50% - J3158 Completed Holloway Controls Systems Ltd From Q25-10324 Provision for 2 weeks (10 days) of SSSTS/Black hat supervision in the Cell A conveyor installation area of the Envision battery cell. ▪ Monday to Thursday (Onsite between the hours of 7:00am – 4:00pm) ▪ Friday (Onsite between the hours of 7:00am – 11:30am) We have not allowed for any work hours outside of what is specified We have not allowed for the procurement any materials / equipment or devices We have allowed for only the supply of none working supervisor. £4,000.00 On Track 100% 13/03/2026 J3157 Completed AESC UK Plant 2 Limited TabLam Safety Mods L1- Add cost to go with 4800108853 £2,440.75 On Track 100% 17/03/2026 J3156 Completed NKC Conveyors ( UK) Ltd ST141 Additional Stopper after cooling £8,516.00 On Track 100% - J3155 Completed AESC UK Plant 2 Limited Tab Lam Safety Modification Line 1 £22,325.25 On Track 100% - J3154 Active GB Lubricants Pump Control panel System £62,986.00 On Track 60% - J3153 Completed NMUK PBS HMI Screen modifications for Remote start £5,863.00 On Track 100% - J3152 Completed Erwin Hymer Group UK Limited Motorhome Bay 3 Safety Gate Interlock Update £3,881.00 On Track 100% 17/02/2026 J3151 Completed NMUK Paint Line 2 Sealer Booth Help Alarm Stations Extra £2,000.00 On Track 100% - J3150 Completed Ring Ready Ltd Procure 32A Isolator £50.00 On Track 100% - J3149 Completed NMUK AVM PLC Changes £6,160.00 On Track 100% - J3148 Completed NMUK Replace fans with Chillers £2,974.00 On Track 100% - J3147 Completed NKC Conveyors ( UK) Ltd Software and HMI modifications to PP22 for Fl32 exit mods £3,840.00 On Track 100% - J3146 Completed Holloway Controls Systems Ltd Procurement of site supervisor course for Adam Wright £330.00 On Track 100% - J3145 Completed NMUK Safety improvements £880.00 On Track 100% - J3144 Completed NMUK Stop and Go cycle time issues £1,280.00 On Track 100% - J3143 Completed NMUK Paint Line 2 Sealer Booth Help Alarm Stations £17,111.00 On Track 100% - J3142 Completed NMUK Replacement of damaged wires on DS5. Work completed 25/01/2026 £695.00 On Track 100% - J3141 Completed NMUK Develop and commission a noddy mode for C2 autochanger £1,280.00 On Track 100% - J3140 Completed NMUK Solvent Farm PLC Fault Investigation £320.00 On Track 100% - J3139 Completed NMUK DL4 Fortress Modification £4,210.00 On Track 100% 01/02/2026 J3138 Active Marelli Interiors United Kingdom PZ1H Bench Drawing's £6,965.00 On Track 85% - J3137 Completed Komatsu UK Ltd Call Out to Paint Plant 06/01/26 £320.00 On Track 100% - J3136 Completed Holloway Controls Systems Ltd Powder Storage Software £30,737.00 On Track 100% - J3135 Completed Holloway Controls Systems Ltd Electrical Testing & Documentation Bolton £1,682.00 On Track 100% - J3134 Completed Holloway Controls Systems Ltd Electrical control panel supplies testing and documentation £8,358.00 On Track 100% 23/01/2026 J3133 Completed Gates Engineering & Services UK Ltd Supply 1 x gate and 1 x fence panel £1,760.00 On Track 100% 31/01/2026 J3132 Completed Firma Durr Assembly Products GmbH Transfer of 5 Mech shifts to Software shifts £3,520.00 On Track 100% - J3131 Completed NMUK BM 25 Days (Late Shift Only) Cover £15,802.00 On Track 100% - J3130 Completed NMUK PZ1H Tool Changer Software £1,280.00 On Track 100% 31/01/2026 J3129 Completed NMUK Install ethernet cable from vision tools IPC to 3.1 panel Install profinet cable from support PC to HMI 3.2 Re-mount gap detect sensors and reflectors at all 4 eccentric lifts on PLC3 using rigid brackets £1,890.00 On Track 100% 31/12/2025 J3128 Completed Marelli Interiors United Kingdom PZ1H 4x Benches £99,654.00 On Track 100% 18/03/2026 J3127 Completed NKC Conveyors ( UK) Ltd New supplies to cabins and rectification works on new workshop £14,185.33 On Track 100% - J3126 Completed Adler Pelzer Washington Ltd Stop testing on Contact oven Light guards £900.00 On Track 100% 31/01/2026 J3125 Active Draeger safety UK Limited IPK Conveyor Modifications £49,992.00 On Track 30% 31/03/2026 J3124 Completed PSI Global Ltd 1 Day Software Support - 15th October £652.00 On Track 100% - J3123 Completed Ring Ready Ltd Replace Timer Relays £656.00 On Track 100% 31/12/2025 J3122 Completed Haskel Europe Ltd Machined Enclosure EN-A039-Q128T £150.00 On Track 100% - J3121 Completed Holloway Controls Systems Ltd AESC Installation Support Extra £5,568.00 On Track 100% 31/12/2025 J3120 Completed NMUK 4 Weeks late shift on call support. Call outs charged at £320 per visit min 4 hours. Excess hours charged at £80ph. Engineer Pool Chris Brookes, Adam Wright, Graham Hughes, Tom Croft £5,000.00 On Track 100% 28/02/2026 J3119 Completed Holloway Controls Systems Ltd Weekly Software Support Onsite £13,732.00 On Track 100% 31/01/2026 J3118 Completed Husqvarna UK Ltd 6 off production benches £27,986.00 On Track 100% 28/02/2026 J3117 Completed NMUK Purchase, Installation and commissioning of smart light £2,059.00 On Track 100% 31/12/2025 J3116 Completed Holloway Controls Systems Ltd AESC Installation Support £5,568.00 On Track 100% 31/12/2025 J3115 Completed Marelli Interiors United Kingdom PZ1D Bench Modification £4,482.00 On Track 100% 31/12/2025 J3114 Completed NKC Conveyors ( UK) Ltd L2 Spares Quotation £3,139.00 On Track 100% - J3113 Completed Holloway Controls Systems Ltd 1 week on site support at AESC £2,800.00 On Track 100% - J3112 Completed NMUK BM 14 Days (Late Shift Only) Cover £9,030.00 On Track 100% - J3111 Completed NMUK UDL2 Cable Pull Extra's £554.00 On Track 100% - J3110 Completed NMUK Battery Marriage Camera Station Safety Gates £4,115.00 On Track 100% 27/12/2025 J3109 Completed NMUK Camera Station Scanner override £3,914.00 On Track 100% 07/12/2025 J3108 Completed NMUK TC Control on Battery Marriage £3,650.00 On Track 100% 31/12/2025 J3107 Completed NMUK Battery Marriage camera station software modifications £970.00 On Track 100% - J3106 Completed NMUK Battery Marriage Tightening Bolt Failure Lamp Beacon £2,267.00 On Track 100% - J3105 Completed New College Durham Safety Guarding Modifications £7,113.00 On Track 100% - J3104 Completed Haskel Europe Ltd Supply of Machined HMI Enclosure £265.63 On Track 100% - J3103 Completed Unipres UK Limited Network Switch Install £827.00 On Track 100% - J3102 Completed NMUK OLSR Shuttle Modification £33,254.00 On Track 100% 31/12/2025 J3101 Completed NMUK FL52 Hanger Conveyor Remote IO £4,838.00 On Track 100% 23/11/2025 J3100 Completed NMUK Rework 1 additional override key switch £1,461.00 On Track 100% 31/12/2025 J3099 Completed NMUK Line 2 Wheel and tyre interrol replacements £20,722.00 On Track 100% 31/12/2025 J3098 Completed NMUK DS5 Control techniques drive replacement £23,060.00 On Track 100% 31/12/2025 J3097 Completed NMUK Line 2 Ring line truck manual control mods £25,662.00 On Track 100% 31/12/2025 J3096 Completed NMUK FL52 Hanger Conveyor Panel Switch Mod £1,458.00 On Track 100% - J3095 Completed NMUK L2 FSM HCT Gateway modbus works £1,218.00 On Track 100% - J3094 Completed NMUK Unload Pullwire extension £830.00 On Track 100% - J3093 Completed NMUK Rework 1 Lightcurtain override £4,234.00 On Track 100% 31/12/2025 J3092 Completed NMUK Safety Keyswitches £4,104.00 On Track 100% - J3091 Completed NMUK Line 2 safety mat project £18,259.00 On Track 100% - J3090 Completed NMUK DS2 Carrier open sensor £5,578.00 On Track 100% - J3089 Completed NMUK Safety Mat DS4 Key Overrides £4,427.00 On Track 100% - J3088 Completed Osbit Limited Commissioning work for wynch £6,453.00 On Track 100% - J3087 Completed Firma Durr Assembly Products GmbH CCR 6x Change Profinet Topology £11,875.00 On Track 100% - J3086 Completed AESC UK Plant 2 Limited ORIGINAL JOB: SOFTWARE SUPPORT £18,750.00 On Track 100% - J3085 Completed NMUK TC Line 2 Seats - Manual Release Stations £6,036.00 On Track 100% - J3084 Active Draeger safety UK Limited Draeger Main Line Works Order Tracking £14,693.00 Over Budget 75% 31/12/2025 J3083 Active Draeger safety UK Limited Draeger Assembly Line Works Order Tracking £14,693.00 On Track 75% 31/12/2025 J3082 Completed AESC UK Plant 2 Limited ORIGINAL JOB: SOFTWARE SUPPORT £18,750.00 On Track 100% - J3081 Completed NMUK EPT Conveyor Lineside Services & Hardware Relocation £7,890.00 On Track 100% - J3080 Completed NMUK PP24 Safety Mods for ST154 Faults £4,103.00 On Track 100% - J3079 Completed Kasai UK Ltd 7 Off Bench Assembly £10,854.93 On Track 100% - J3078 Completed Nissan Motor Manufacturing UK Supply & Install PP02 Fortress Key System £4,621.00 On Track 100% - J3077 Completed Gates Engineering & Services UK Ltd Gates C/O - Gates Fault on Machine 3 £350.00 On Track 100% - J3076 Completed Gates Engineering & Services UK Ltd Shuttle Line Start Push Button £252.00 On Track 100% - J3075 Active BAE Systems Land (UK) BAE Load End Modifications £23,351.00 Warning 35% 31/01/2026 J3074 Completed NMUK Chris Brookes W/E Support - Update Trim Flexisoft Safety Sys £800.00 On Track 100% - J3073 Completed Haskel Europe Limited 3x EN-A017-Q028 Enclosures & Holes Drilled £672.00 On Track 100% - J3072 Completed Draeger safety UK Limited Main Line RFID Mods £46,995.00 On Track 100% - J3071 Completed NMUK Emergency Bdwn C/O 15/08 3am £1,050.00 On Track 100% - J3070 Completed AESC UK Ltd Supply 3 off Rack Mounted Power Supplies £554.60 On Track 100% - J3069 Completed Salamander Pumps Additional HMI Upgrades £9,197.00 On Track 100% - J3068 Completed NMUK Integrate x2 New AGV's into L2 FRT Member Loop £2,620.00 On Track 0% - J3067 Completed NKC Conveyors ( UK) Ltd CB14-3 Removal and Control Relocation £2,213.00 On Track 100% - J3066 Completed Nissan Motor Manufacturing UK Stop & Go + Battery Marriage Cable Splitter Purchase £16,116.00 On Track 100% - J3065 Completed Nissan Motor Manufacturing UK Battery Marriage + Stop & Go - Cable Splitters £14,196.00 On Track 100% - J3064 Completed Nissan Motor Manufacturing UK DS2 BOOP Sensor - Model Specific Detection Upg £10,262.00 On Track 100% - J3063 Completed Nissan Motor Manufacturing UK Backup Lifter Overrun Additional Panel Wiring £234.00 On Track 100% - J3062 Completed Nissan Motor Manufacturing UK PP22 CB7 Relocation £1,278.00 On Track 100% - J3061 Completed Gates Engineering & Services UK Ltd Impulse Machine Safety & PLC Upgrade £43,822.00 On Track 100% - J3060 Completed NKC Conveyors ( UK) Ltd N7 Power Supply Install to Jigging Area £976.00 On Track 100% - J3059 Completed ADS Ltd Repair Failed PSU at The Square Birmingham £1,732.00 On Track 100% - J3058 Completed Nissan Motor Manufacturing UK Pusher Protection Limit Switch Installation £960.00 On Track 100% - J3057 Completed Nissan Motor Manufacturing UK C5.1 Model & Tooling Check Modifications £3,930.00 On Track 100% - J3056 Completed Nissan Motor Manufacturing UK Activity Mods to L2 C2/DS2 Safety Circuits £7,085.00 On Track 100% - J3055 Completed Calibrate Inc Limited Gas Booster Fault Support £1,598.00 On Track 100% - J3054 Completed NKC Conveyors ( UK) Ltd Thailand - Jack Skelton £13,950.00 On Track 100% - J3053 Completed ADS Ltd Supply of Replacement HMI for Block B Hove System £3,099.86 On Track 100% - J3052 Completed NKC Conveyors ( UK) Ltd AS3A Additional Limit Switch Install £1,160.00 On Track 100% - J3051 Completed Gestamp 4x Manufacture Controls Cabinets for AGV P2N £48,098.00 On Track 100% - J3050 Completed Nissan Motor Manufacturing UK Friction Feeder 2 - Home Limit Switch Mods £1,610.00 On Track 100% - Load More Projects (150 loaded, showing 150 after filters) Loading in batches for better performance. Use filters to narrow results.