[ERP bug-fix] Bug from /resource-manager
FAIL — 1 browser check(s) failed
| Project | ops-ar-erp |
|---|---|
| Task | b6fdc538-1a21-494b-aa1f-374dac771737 |
| Updated | 2026-06-19T14:35:53.210438+00:00 |
Screenshots



























Verification Notes
# Verification — [ERP bug-fix] Bug from /resource-manager
**Result:** ❌ FAIL `FAIL — 1 browser check(s) failed`
**When:** 20260619T143443Z
**URL:** http://100.121.252.85:3180/
## Screenshots



























## Proof plan
- **Level:** 2
- **Task browser checks:** 2
- **API checks:** 0
- **task_browser_checks_present:** PASS — Worker must declare task-specific browser_checks in .orch-done.json.
- **task_browser_checks_substantive:** PASS — Browser checks must target changed feature routes and specific selectors/text/actions.
- **browser_checks_grounded:** PASS — Browser checks must use concrete routes and stable user-facing selectors.
- **level2_scope_bounded:** PASS — Level 2 browser checks must stay focused (40 actions max per check). Split broad regression journeys into separate focused checks or Level 3 recipes.
- **level2_entry_to_target_flow:** PASS — Level 2 requires an entry-to-target browser-flow check that starts at entry/login and navigates by visible controls. (For pure render assertions, set kind: static_render on each check.)
- **level2_user_actions:** PASS — Level 2 requires safe user actions such as click, fill, upload, select, or press. (For pure render assertions, set kind: static_render on each check.)
- **level2_assertions:** PASS — Level 2 requires selector/text assertions proving the changed UI state.
- **level2_expected_result:** PASS — Level 2 requires expected_result/success_criteria explaining what success looks like.
- **level2_positive_assertion:** PASS — Level 2 requires at least one POSITIVE assertion — a concrete assert_text value (e.g. the corrected £ total) or that a specific element is present. Absence-only checks (assert_no_text) do not prove the fix; they pass on an empty or wrong page.
## Task-specific browser checks
- **project-planning-grid-shows-all-active-projects-in-filter-2026-06-18:** `/resource-manager` — selectors: (none); text: Manage electrician and engineer availability; actions: 7
- **popout-preserves-selected-project-2026-06-18:** `/resource-manager` — selectors: (none); text: Manage electrician and engineer availability; actions: 6
## Notes
- Verification level 2
- ✓ task proof plan L2: 2 task browser check(s), 0 API check(s)
- Task-proof-only mode: Level 1 launch smoke already passed; skipping baseline browser checks.
- Playwright MCP required for level 2+ UI proof; validating worker-declared MCP-backed checks.
- ✓ readiness gate: app ready after 1 probe(s) (status 200)
- networkidle not reached after login (app polls continuously) — non-fatal; confirming login via login-form disappearance instead.
- Logged in as claude-dev@arcontrols.internal
- Browser flow 'project-planning-grid-shows-all-active-projects-in-filter-2026-06-18' started at /; target is /resource-manager. Navigation must use visible UI actions from here.
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 1 navigate
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 2 [data-testid="project-planning-grid-project-filter-trigger"]
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 3 [data-testid="project-planning-grid-project-filter-trigger"]
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 4 [data-testid="project-planning-grid-project-id-option"]
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 5 [data-testid="project-planning-grid-project-id-option"]
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 6 Filter by Project
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: step 7 Manage electrician and engineer availability
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: browser flow reached target path /resource-manager
- ✓ project-planning-grid-shows-all-active-projects-in-filter-2026-06-18: text present: Manage electrician and engineer availability
- Browser flow 'popout-preserves-selected-project-2026-06-18' started at /; target is /resource-manager. Navigation must use visible UI actions from here.
- ✓ popout-preserves-selected-project-2026-06-18: step 1 navigate
- ✓ popout-preserves-selected-project-2026-06-18: step 2 [data-testid="project-planning-grid-project-filter-trigger"]
- ✓ popout-preserves-selected-project-2026-06-18: step 3 [data-testid="project-planning-grid-project-filter-trigger"]
- ✓ popout-preserves-selected-project-2026-06-18: step 4 [data-testid="project-planning-grid-project-id-option"]
- ✗ popout-preserves-selected-project-2026-06-18: step 5 [data-testid="project-planning-grid-popout-button"]: popup action failed: Locator.click: Timeout 30000ms exceeded.
Call log:
- waiting for locator("[data-testid=\"project-planning-grid-popout-button\"]")
- locator resolved to <button data-testid="project-planning-grid-popout-button" title="Open the planner full-screen in a new tab" class="inline-flex items-center justify-center whitespace-nowrap font-medium transition-colors focus-visible:outline-none focus-visible:ring-1 focus-visible:ring-ring disabled:pointer-events-none disabled:opacity-50 [&_svg]:pointer-events-none [&_svg]:size-4 [&_svg]:shrink-0 border border-input shadow-sm hover:bg-accent hover:text-accent-foreground h-8 rounded-md px-3 text-xs gap-1">…</button>
- attempting click action
2 × waiting for element to be visible, enabled and stable
- element is visible, enabled and stable
- scrolling into view if needed
- done scrolling
- <html lang="en">…</html> intercepts pointer events
- retrying click action
- waiting 20ms
2 × waiting for element to be visible, enabled and stable
- element is visible, enabled and stable
- scrolling into view if needed
- done scrolling
- <html lang="en">…</html> intercepts pointer events
- retrying click action
- waiting 100ms
58 × waiting for element to be visible, enabled and stable
- element is visible, enabled and stable
- scrolling into view if needed
- done scrolling
- <html lang="en">…</html> intercepts pointer events
- retrying click action
- waiting 500ms
- ✓ popout-preserves-selected-project-2026-06-18: step 6 Manage electrician and engineer availability
- ✓ popout-preserves-selected-project-2026-06-18: browser flow reached target path /resource-manager
- ✓ popout-preserves-selected-project-2026-06-18: text present: Manage electrician and engineer availability
- Ignored 21 aborted background fetch console error(s); task browser checks, API checks, and runtime checks decide this proof.
## Console errors
- `[error] Error fetching PO requests: TypeError: Failed to fetch
at d (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:45670)`
- `[error] Error fetching checklist settings: TypeError: Failed to fetch
at h (http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:16800)`
- `[error] 🔔 NotificationsDropdown: Error fetching notification summary: TypeError: Failed to fetch
at T (http://100.121.252.85:3180/static/js/505.03a7c875.chunk.js:1:76319)`
- `[error] Failed to fetch new task count: TypeError: Failed to fetch
at e (http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:1494)`
- `[error] Error fetching pending QA checks: TypeError: Failed to fetch
at g (http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:17088)`
- `[error] Failed to fetch HR settings: TypeError: Failed to fetch
at http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:1841`
- `[error] Failed to check weekend availability: TypeError: Failed to fetch
at http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:88958`
- `[error] Failed to fetch HR settings: TypeError: Failed to fetch
at http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:1841`
- `[error] Error fetching POs: TypeError: Failed to fetch
at d (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:18190)`
- `[error] Error fetching projects: TypeError: Failed to fetch
at x (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:15247)`
- `[error] Error fetching tasks: TypeError: Failed to fetch
at o (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:20462)`
- `[error] Error fetching approval requests: TypeError: Failed to fetch
at x (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:48850)`
- `[error] Failed to check projects due date: TypeError: Failed to fetch
at http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:89576`
- `[error] Failed to check for nudges: TypeError: Failed to fetch
at d (http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:20072)`
- `[error] Error fetching batch widget data: TypeError: Failed to fetch
at P (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:67040)`
- `[error] 🔔 NotificationsDropdown: Error fetching notification summary: TypeError: Failed to fetch
at T (http://100.121.252.85:3180/static/js/505.03a7c875.chunk.js:1:76319)`
- `[error] Error fetching staff comms: TypeError: Failed to fetch
at g (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:36764)`
- `[error] Error fetching budget warnings: TypeError: Failed to fetch
at x (http://100.121.252.85:3180/static/js/872.89f56c8c.chunk.js:1:23348)`
- `[error] Failed to check timesheet compliance: TypeError: Failed to fetch
at u (http://100.121.252.85:3180/static/js/9627.a1760778.chunk.js:1:14096)`
- `[error] 🔔 NotificationsDropdown: Error fetching notification summary: TypeError: Failed to fetch
at T (http://100.121.252.85:3180/static/js/505.03a7c875.chunk.js:1:76319)`
## Network issues
- `GET http://100.121.252.85:3180/api/notifications/stream?access_token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJzdWIiOiJjbGF1ZGUtZGV2QGFyY29udHJvbHMuaW50ZXJuYWwiLCJ1c2VyX2lkIjoiN2NlNDFmZjAtZDBmNy00NzMxLTkzNG — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/notifications/stream?access_token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJzdWIiOiJjbGF1ZGUtZGV2QGFyY29udHJvbHMuaW50ZXJuYWwiLCJ1c2VyX2lkIjoiN2NlNDFmZjAtZDBmNy00NzMxLTkzNG — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/dashboard/widgets/po-requests — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/system-settings/ — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/notifications/summary — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/tasks/new-count — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/qa/my-pending-checks — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/employees/my-file — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/resources/check-weekend-availability — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/employees/my-file — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/dashboard/widgets/purchase-orders — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/dashboard/widgets/current-projects — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/notifications/stream?access_token=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJzdWIiOiJjbGF1ZGUtZGV2QGFyY29udHJvbHMuaW50ZXJuYWwiLCJ1c2VyX2lkIjoiN2NlNDFmZjAtZDBmNy00NzMxLTkzNG — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/dashboard/widgets/task-allocations — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/dashboard/widgets/approval-requests — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/projects/without-due-date — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/resources/nudge/active — net::ERR_ABORTED`
- `POST http://100.121.252.85:3180/api/dashboard/widgets/batch — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/email-inbox/stats — net::ERR_ABORTED`
- `GET http://100.121.252.85:3180/api/notifications/summary — net::ERR_ABORTED`
Run Metadata
{
"created_at": "2026-06-19T14:35:53.213259+00:00",
"github_storage": false,
"passed": false,
"pr_url": "",
"project": "ops-ar-erp",
"run_id": "ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager",
"source_path": "/root/orchestrator/workspace/ops-ar-erp-orch-b6fdc5381a21/evidence/20260619T143443Z-b6fdc538",
"storage": "orchestrator-vps",
"summary": "FAIL \u2014 1 browser check(s) failed",
"task_id": "b6fdc538-1a21-494b-aa1f-374dac771737",
"task_short": "b6fdc538",
"title": "[ERP bug-fix] Bug from /resource-manager"
}Artifacts
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/01-landing.png (108014 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/01-landing.png (108014 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/02-post-login.png (169360 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/02-post-login.png (169360 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-00-journey-start.png (78009 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-00-journey-start.png (78009 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-01-navigate.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-01-navigate.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-04-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-04-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-04-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-04-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-05-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-05-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-05-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-05-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-06-filter-by-project.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-06-filter-by-project.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-07-manage-electrician-and-engineer-availability.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18-07-manage-electrician-and-engineer-availability.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/03-project-planning-grid-shows-all-active-projects-in-filter-2026-06-18.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-00-journey-start.png (144484 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-00-journey-start.png (144484 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-01-navigate.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-01-navigate.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-02-data-testid-project-planning-grid-project-filter-trigger.png (110076 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger-element.png (1760 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-03-data-testid-project-planning-grid-project-filter-trigger.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-04-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-04-data-testid-project-planning-grid-project-id-option-element.png (1694 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-04-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-04-data-testid-project-planning-grid-project-id-option.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-05-data-testid-project-planning-grid-popout-button-element.png (1366 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-05-data-testid-project-planning-grid-popout-button-element.png (1366 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-05-data-testid-project-planning-grid-popout-button.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-05-data-testid-project-planning-grid-popout-button.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18-06-manage-electrician-and-engineer-availability.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18-06-manage-electrician-and-engineer-availability.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/04-popout-preserves-selected-project-2026-06-18.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/screenshots/04-popout-preserves-selected-project-2026-06-18.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/VERIFICATION.md (17627 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/browser-checks.json (4957 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/checks.json (4957 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/console.log (3111 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/dom-innerText.txt (3939 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/dom.html (136104 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/dom.html (136104 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/network.json (60099 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/portal-meta.json (568 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/proof-plan.json (2147 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/proof-plan.json (2147 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/result.json (11520 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-2/result.json (11520 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/result.json (11520 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/screenshot.png (158714 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/level-1/smoke.json (371 bytes)
- ops-ar-erp-b6fdc538-20260619-143553-erp-bug-fix-bug-from-resource-manager/verification-report.docx (2586281 bytes)